Sewer System Evaluation & Rehabilitation (SSERP)
SSERP Project Overview
The Sewerage and Water Board of New Orleans (SWBNO) has undertaken a multi-year program, the Sewer System Evaluation and Rehabilitation Program (SSERP), to identify and address structural and mechanical deficiencies in the wastewater collection system and to ensure that the system has adequate capacity. These improvements, currently estimated to cost $600 million over a ten year period, are required to comply with Section XV-Clean Water Act Remedial Measures: Comprehensive Collection System Remedial Program of the Consent Decree between the S&WB and the United States Environmental Protection Agency. The Consent Decree was signed in June 1998.
Between 1998 and 2002, two sewer rate increases were approved to fund these improvements. The rate increases were necessary to meet Consent Decree requirements. Both the Board and City Council have worked hard to minimize the impact on customers, but additional rate increases will be needed to continue the program on schedule. Failure to meet required milestones for rehabilitation can result in severe financial penalties being imposed by the Environmental Protection Agency.
Below is a map with all the ongoing sewer work and planned work for the Carrollton Basin as part of the program, which will be updated once a month.
To find more information about your block specifically, please view the information provided on the spreadsheet, which will be updated once a month.
Below, you will find each separate contract/project with the contractor’s name and the projected 2 week lookahead that is provided on a weekly basis. We will update this information as it becomes available each week. Please note that these dates are weather permitting, meaning dates could be pushed back due to inclement weather.
If you do not find your block on the map or spreadsheet, it could be a part of the Joint Infrastructure projects ongoing in the area, as well. You can look up addresses/blocks at their website, https://gis.nola.gov/roadwork/. For further assistance in locating work on your block / in your neighborhood, please visit our Work Order Dashboard.
Thank you for your patience while we upgrade your sewer system. If you have any questions, please contact Community Outreach at Outreach@swbno.org.
Contracts / Contractor
View Archived Status Reports30228 – Fleming
- Sewer work is 100% complete; roadway restoration is ongoing to 4000 and 4200 blocks of Monroe Street to wrap up the project.
- View Archived Status Reports
30229 – BLD
- BLD Contract 30229 update 6.30.25 PDF
- BLD Contract 30229 update 6.9.2025.pdf PDF
- BLD Contract 30229 update 6.2.2025.pdf PDF
- View Archived Status Reports
30230 – BLD
- BLD Contract 30230 update 6.30.25 PDF
- BLD Contract 30230 6.23.25 PDF
- BLD Contract 30230 update 6.9.2025.pdf PDF
- BLD Contract 30230 update 6.2.2025.pdf PDF
- View Archived Status Reports
30232 – BLD
- BLD Contract 30232 update 6.30.25 PDF
- BLD Contract 30232 update 6.9.2025.pdf PDF
- BLD Contract 30232 update 6.2.2025.pdf PDF
- View Archived Status Reports
30235 – BLD
- BLD Contract 30235 update 6.30.25 PDF
- BLD Contract 30235 update 6.30.25 PDF
- BLD Contract 30235 update 6.30.25 PDF
- BLD Contract 30235 update 6.9.2025.pdf PDF
- BLD Contract 30235 update 6.2.2025.pdf PDF
- View Archived Status Reports
30245 – Impetus aka RNGD
- Sewer work 100% completed.
- View Archived Status Reports
30248 – Fleming
- Sewer work has been completed.
- View Archived Status Reports
30249 – Impetus aka RNGD
- Sewer work has been completed.
- View Archived Status Reports
30251 – BLD
- BLD Contract 30251 update 6.30.25 PDF
- BLD Contract 30251 update 6.9.2025.pdf PDF
- BLD Contract 30251 update 6.2.25.pdf PDF
- View Archived Status Reports
30252 – BLD
- BLD Contract 30252 update 6.30.25 PDF
- BLD Contract 30252 update 6.9.2025.pdf PDF
- BLD Contract 30252 update 6.2.2025.pdf PDF
- View Archived Status Reports
30253 – BLD
- BLD Contract 30253 update 6.30.25 PDF
- BLD Contract 30253 update 6.9.2025.pdf PDF
- BLD Contract 30253 update 6.2.2025.pdf PDF
- View Archived Status Reports
30254 – BLD
- BLD Contract 30254 update 6.30.25 PDF
- BLD Contract 30254 update 6.9.2025.pdf PDF
- BLD Contract 30254 update 6.2.2025.pdf PDF
- View Archived Status Reports
30255 – Fleming
30256 – HRC
- HRC Contract 30256 update 6.9.2025.pdf PDF
- HRC Contract 30256 Update 6.2.25.pdf PDF
- View Archived Status Reports
30257 – Drennan
- Drennan Contract 30257 update 6.30.25 PDF
- Drennan Contract 30257 update 6.9.2025.pdf PDF
- Drennan Contract 30257 update 6.2.2025.pdf PDF
- View Archived Status Reports
30258 – Drennan
- Drennan Contract 30257 update 6.30.25 PDF
- Drennan Contract 30258 update 6.9.2025.pdf PDF
- Drennan Contract 30258 update 6.2.2025.pdf PDF
- View Archived Status Reports
30258 – BLD
30259 – HRC
- HRC Contract 30259 update 6.9.2025.pdf PDF
- HRC Contract 30259 Update 6.2.25.pdf PDF
- View Archived Status Reports
30260 – HRC
- HRC Contract 30260 update 6.9.2025.pdf PDF
- HRC Contract 30260 Update 6.2.25.pdf PDF
- View Archived Status Reports
30261 – HRC